S.NO. |
PROGRAM TITLE |
DATE |
VENUE |
FEES US$ |
T1 |
Mechanical Properties of PWR Reactor Plant System Materials |
24-28/1/2009 |
Cairo |
2990 |
T2 |
LV/MV/HV Circuit breakers (Switchgear): Inspection, Maintenance, Design, Repair & Troubleshooting |
7-11/2/2009 |
Cairo |
2990 |
T3 |
Lifting & Rigging Equipment: Selection, Sizing, Applications, Operation, Diagnostic Testing, troubleshooting and Maintenance |
14-18/2/2009 |
Cairo |
2990 |
I160 |
Control & Safety Relief Valves: Operation, Selection & Troubleshooting |
14-18/2/2009 |
Cairo |
2990 |
T4 |
Electrical Power Systems Quality & Troubleshooting |
14-18/2/2009 |
Cairo |
2990 |
T5 |
Industrial Boilers “Operation - Maintenance |
14-18/3/2009 |
Cairo |
2990 |
T6 |
Safe Operation & Maintenance of Circuit Breakers and Switchgears |
14-18/3/2009 |
Cairo |
2990 |
T10 |
Root Cause Failure Analysis (RCFA): Methods and Techniques |
4-8/4/2009 |
Cairo |
2990 |
T11 |
Advanced Steel Structure Design, Construction & Inspection |
11-15/4/2009 |
Cairo |
2990 |
T12 |
Uninterruptible Power Supply UPS) Selection, Installation, Maintenance & Operation |
18-22/4/2009 |
Cairo |
2990 |
T13 |
HVAC Performance Evaluation & Improvement of Reliability for Based Maintenance Systems |
18-22/4/2009 |
Cairo |
2990 |
T15 |
Electrical Equipment & Control Systems; Commissioning, Testing & Start up of Electrical Systems |
25-29/4/2009 |
Cairo |
2990 |
T21 |
Computer Management Maintenance Systems
( CMMS ) |
9-13/5/2009 |
Cairo |
2990 |
T22 |
Quantitative Delay Analysis & E.O.T. Entitlement |
9-13/5/2009 |
Cairo |
2990 |
T26 |
FIDIC Construction Contracts |
16-20/5/2009 |
Cairo |
2990 |
T27 |
Machinery Bearing Lubrication & Reliability (Tribology) |
16-20/5/2009 |
Cairo |
2990 |
I161 |
Valves Calibration & Maintenance |
16-20/5/2009 |
Cairo |
2990 |
I160 |
Power Systems Protection |
16-20/5/2009 |
Cairo |
2990 |
T30 |
Advanced Gas Chromatography Techniques & Troubleshooting |
23-27/5/2009 |
Cairo |
2990 |
T36 |
Mechanical Integrity & Reliability in Refineries, Petrochemical & Process Plants |
30/5-3/6/2009 |
Cairo |
2990 |
T37 |
Mechanical Equipment: Control Valves, Actuators & Pumps Selection, Calculations, Sizing, Applications, Operation, Diagnostic Testing, Troubleshooting & Maintenance |
6-10/6/2009 |
Cairo |
2990 |
I164 |
Fault Finding in Electrical Circuit & Equipment |
6-10/6/2009 |
Cairo |
2990 |
I166 |
Machinery Vibration Monitoring & Analysis |
13-17/6/2009 |
Cairo |
2990 |
T42 |
Advanced Process Control & Loop Tuning |
20-24/6/2009 |
Cairo |
2990 |
T43 |
Generators: Operations, Maintenance, Control, Testing and Troubleshooting |
20-24/6/2009 |
Cairo |
2990 |
I167 |
Turbo – Generator Power Plants
(Operation and Control) |
20-24/6/2009 |
Cairo |
2990 |
I169 |
SCADA Applications in Water Network |
27/6-1/7/2009 |
Cairo |
2990 |
I170 |
Pumps Testing & Performance Curve Using PC |
27/6-1/7/2009 |
Cairo |
2990 |
T47 |
Detection & Measurement of Water Leaks & Losses in Water Networks |
27/6-1/7/2009 |
Cairo |
2990 |
T48 |
Maintenance of Circuit Breakers &Transformers |
4-8/7/2009 |
Cairo |
2990 |
T49 |
Machinery Failure Analysis & Prevention |
4-8/7/2009 |
Cairo |
2990 |
T50 |
Safe Handling, Operation & Maintenance of Electrical Equipment |
4-8/7/2009 |
Cairo |
2990 |
T51 |
Construction Site Management & Supervision |
4-8/7/2009 |
Cairo |
2990 |
I171 |
Reliability, Availability, Maintainability Study (RAM) |
4-8/7/2009 |
Cairo |
2990 |
I172 |
Advance Process Control Operation & Troubleshooting |
4-8/7/2009 |
Cairo |
2990 |
T55 |
Advanced Engineering Management & Maintenance Techniques |
4-15/7/2009 |
Cairo |
5750 |
T56 |
Laboratory Quality Management (ISO17025): SOP, Accreditation, Documentation and Auditing |
11-15/7/2009 |
Cairo |
2990 |
I174 |
Piping Design, Construction & Mechanical Integrity |
11-15/7/2009 |
Cairo |
2990 |
I175 |
Vibration Analysis Conditioning Monitoring of rotating Machines |
11-15/7/2009 |
Cairo |
2990 |
T57 |
Fault Diagnosis of Pumps, Turbines & Compressor |
11-15/7/2009 |
Cairo |
2990 |
T58 |
Switchgears & Circuit Breakers for Electrical Protection |
11-15/7/2009 |
Cairo |
2990 |
I176 |
Concrete Deterioration Assessment, Cause & Protection |
11-15/7/2009 |
Cairo |
2990 |
T59 |
Transportation & Road Infrastructure Management & Life Cycle Cost Analysis |
11-22/7/2009 |
Cairo |
5750 |
T61 |
Corrosion in the Oil & Gas Industry |
18-22/7/2009 |
Cairo |
2990 |
T62 |
Pumps & Compressors Operation Maintenance & Troubleshooting |
18-22/7/2009 |
Cairo |
2990 |
I179 |
The Complete Comprehensive Workshop on Valve Engineering Techniques |
18-22/7/2009 |
Cairo |
2990 |
T64 |
Mechanical Seals for Pumps & Compressors in Service |
25-29/7/2009 |
Cairo |
2990 |
I180 |
Road Pavement Projects Design, Construction & Maintenance |
25-29/7/2009 |
Cairo |
2990 |
T65 |
Industrial Equipment: COMPRESSORS, PUMPS, MOTORS & VARIABLE-SPEED DRIVES: Selection, Sizing, Applications, Operation, Diagnostic Testing, Troubleshooting & Maintenance |
25-29/7/2009 |
Cairo |
2990 |
T66 |
Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives |
25-29/7/2009 |
Cairo |
2990 |
I181 |
Design & Inspection Of Refractory Materials for Refineries, Power Generation & Petrochemical Plants |
25-29/7/2009 |
Cairo |
2990 |
T72 |
Rewinding & Maintenance of Electric Motors & Generator Alternator |
1-5/8/2009 |
Cairo |
2990 |
T73 |
Process Plant Start up & Commissioning |
1-5/8/2009 |
Cairo |
2990 |
I183 |
Reliability, Availability & Maintainability (RAM) |
1-5/8/2009 |
Cairo |
2990 |
I184 |
Integrated Contingency Planning for Industrial Emergencies (ICP) |
1-5/8/2009 |
Cairo |
2990 |
T74 |
Power Generation: Gas Turbines, Steam Power Plants, Co-Generation & Combines Cycle Plants: Selection, Applications, Operation, Maintenance & Economics |
1-12/8/2009 |
Cairo |
5750 |
T83 |
Maintenance Technology Best Practices: Inspection, Analysis & Monitoring |
8-12/8/2009 |
Cairo |
2990 |
T84 |
Process Equipment Design for Refineries Petrochemical & Related Process Plants |
8-12/8/2009 |
Cairo |
2990 |
T85 |
Gas Turbine Technology: Design, Operation, T Control, Troubleshooting and Maintenance |
8-12/8/2009 |
Cairo |
2990 |
T86 |
Power System: Computerized Protection, Automation, Economic Operation & Load Dispatch |
8-12/8/2009 |
Cairo |
2990 |
I188 |
OSHA Standards for Safety, Loss Prevention, Fire & Protection Professionals |
15-19/8/2009 |
Cairo |
2990 |
I189 |
Maintenance Support Design/Redesign (MSDR) |
15-19/8/2009 |
Cairo |
2990 |
T94 |
Preventive Maintenance of Electric Equipment |
3-7/10/2009 |
Cairo |
2990 |
T95 |
Industrial Equipment: COMPRESSORS, PUMPS, MOTORS and VARIABLE-SPEED DRIVES: Selection, Sizing, Applications, Operation, Diagnostic Testing, Troubleshooting & Maintenance |
3-7/10/2009 |
Cairo |
2990 |
I190 |
Design & Selection of Air Conditioning Units (Practical Application) |
3-7/10/2009 |
Cairo |
2990 |
I191 |
Rotating Equipment – Predictive & Preventive Maintenance |
3-7/10/2009 |
Cairo |
2990 |
T96 |
LV & HV Switchgear Selection, Maintenance & Control |
10-14/10/2009 |
Cairo |
2990 |
T97 |
Process Plant Start-Up, Commissioning & Troubleshooting |
10-14/10/2009 |
Cairo |
2990 |
T98 |
Advanced Process Risk Assessment & Risk Management |
17-21/10/2009 |
Cairo |
2990 |
I193 |
Planning, Design, & Performance of the Electric Power Distribution Systems |
17-21/10/2009 |
Cairo |
2990 |
T99 |
Reservoir Engineering & Management: Analysis, T Characterization, Simulation, Integration, Statistics & Naturally Fractured |
17-21/10/2009 |
Cairo |
2990 |
T103 |
Gas Transmission & Distribution Piping Systems |
24-28/10/2009 |
Cairo |
2990 |
T104 |
Operation & Maintenance of Steam Turbines |
24-28/10/2009 |
Cairo |
2990 |
T105 |
Modern Project Management, Risk Avoidance and Negotiation Skills |
24-28/10/2009 |
Cairo |
2990 |
I195 |
Mechanical Seals & Packing |
31/10-4/11/2009 |
Cairo |
2990 |
T108 |
Centrifugal Compressor and steam Turbines – DESIGN, OPERATION & MAINTENANCE |
31/10-4/11/2009 |
Cairo |
2990 |
I196 |
Measuring & Improving Power Plant Efficiency |
31/10-4/11/2009 |
Cairo |
2990 |
T110 |
CMMS Computerized Maintenance Systems- Advanced |
31/10-4/11/2009 |
Cairo |
2990 |
T114 |
Heat Exchanger Design, Performance, Inspection Maintenance & Operation |
7-11/11/2009 |
Cairo |
2990 |
T115 |
Safe Handling, Operation & Maintenance of Electrical Equipment in Hazardous Areas & Classification |
7-11/11/2009 |
Cairo |
2990 |
T117 |
Elements of Applied Process Engineering & Practical Technology Process Engineering Fundamentals |
14-18/11/2009 |
Cairo |
2990 |
T118 |
Advanced Mechanical Maintenance Planning Control & Implementation |
14-18/11/2009 |
Cairo |
2990 |
I197 |
Preventive & Predictive Maintenance for Overhead Lines |
14-18/11/2009 |
Cairo |
2990 |
T120 |
Maintenance Planning, Control & Documentation |
21-25/11/2009 |
Cairo |
2990 |
I198 |
Quantity Surveying for Engineering Projects |
21-25/11/2009 |
Cairo |
2990 |
T121 |
Transformer Operation, Maintenance & Testing |
21-25/11/2009 |
Cairo |
2990 |
T122 |
Bearings Selection & Troubleshooting |
21-25/11/2009 |
Cairo |
2990 |
I199 |
Welding Metallurgy, technology & Inspection |
21-25/11/2009 |
Cairo |
2990 |
T123 |
Construction Site Management & Supervision – Advanced Techniques |
5-9/12/2009 |
Cairo |
2990 |
T124 |
Feeder Identification & Distribution Cables Tracing & Fault Location |
5-9/12/2009 |
Cairo |
2990 |
I120 |
Reading & Interpretation of Mechanical Engineering Drawings |
5-9/12/2009 |
Cairo |
2990 |
T127 |
Power Transformers: Design, Manufacture, Testing, Operation & Maintenance |
12-16/12/2009 |
Cairo |
2990 |
T128 |
Power System: Computerized Protection, Automation, Economic Operation & Load Dispatch |
12-16/12/2009 |
Cairo |
2990 |
T130 |
Pipeline Design & Fabrication |
19-23/12/2009 |
Cairo |
2990 |
T131 |
Industrial Equipment: Compressors, Pumps, Motors & Variable Speed Drive: Selection, Sizing, Application |
19-23//12/2009 |
Cairo |
2990 |
I204 |
Centrifugal Compressors & Operation & Maintenance |
19-23/12/2009 |
Cairo |
3550 |
T132 |
Fault Analysis in Service Networks and Electric Industrial Networks |
19-23/12/2009 |
Cairo |
2990 |
I205 |
Thyrstor Applications in Power Distribution & Motor Speed Control |
26-30/12/2009 |
Cairo |
2990 |
I206 |
Installation & Troubleshooting of MV Overhead Distribution Lines |
26-30/12/2009 |
Cairo |
2990 |
T136 |
Computerized Advances of Power System Analysis & Design |
26-30/12/2009 |
Cairo |
2990 |
T137 |
Constructional Material & Environmental Considerations in Project Design & Installation |
26-30/12/2009 |
Cairo |
2990 |
T139 |
Pumps & Turbines Maintenance |
26-30/12/2009 |
Cairo |
2990 |