S.NO. |
PROGRAM TITLE |
DATE |
VENUE |
FEES US$ |
| T78 |
Implementing Best Practices in Multi-Shift Operations: Maximizing Productivity Through Round-The-Clock Operations |
3-7/8/2009 |
Cyprus |
3550 |
| T79 |
Gas Reservoir Engineering |
3-7/8/2009 |
Cyprus |
3550 |
| T 81 |
Safety Instrumentation System for Process Industry in Oil & Gas |
3-7/8/2009 |
Cyprus |
3550 |
| T92 |
Health & Safety Management in the Oil & Gas Industries (Best Practice) |
10-14/8/2009 |
Cyprus |
3550 |
| T93 |
Pumps: Selection, Operation, Testing, Troubleshooting & Maintenance |
10-14/8/2009 |
Cyprus |
3550 |
| T106 |
Practical Machinery Vibration Monitoring, Analysis & Predictive Maintenance |
26-30/10/2009 |
Cyprus |
3550 |
| T107 |
Pollution Monitoring & Control in Power Systems |
26-30/10/2009 |
Cyprus |
3550 |
| T109 |
Advanced Valve Technology: Design, Selection, Installation, Applications, Sizing, Inspection, Maintenance & Troubleshooting |
31/10-4/11/2009 |
Cyprus |
3550 |
| T111 |
Gas Processing, Treatment & Sulphur Recovery |
2-6/11/2009 |
Cyprus |
3550 |
| T112 |
Emergency Shutdown & Operations; Applied Technology & Procedures |
2-6/11/2009 |
Cyprus |
3550 |
| T113 |
Preparation of Plants for Maintenance |
2-6/11/2009 |
Cyprus |
3550 |
| I201 |
Installation, Calibration & Maintenance of Power Consumption Meters & telemeters |
7-11/12/2009 |
Cyprus |
3550 |
| I202 |
Metallurgy, Corrosion & Prevention of Failures |
7-11/12/2009 |
Cyprus |
3550 |