S.NO. |
PROGRAM TITLE |
DATE |
VENUE |
FEES US$ |
| T5 |
Industrial Boilers “Operation - Maintenance |
14-18/3/2009 |
Cairo |
2990 |
| T6 |
Safe Operation & Maintenance of Circuit Breakers and Switchgears |
14-18/3/2009 |
Cairo |
2990 |
| T7 |
Accident Investigation & Analysis for Safety, Health & Security Professionals Practical Techniques |
22-26/3//2009 |
Abu Dhabi |
2990 |
| T8 |
Advanced Maintenance Management: Planning, Scheduling and Control |
29/3-2/4/2009 |
Abu Dhabi |
2990 |
| T9 |
Process Reactors: OPERATION, TROUBLESHOOTING, START-UP & SHUTDOWN: Hydro-Treating, Catalytic Reforming & Hydro-Cracking |
29/3-2/4/2009 |
Abu Dhabi |
2990 |
| T10 |
Root Cause Failure Analysis (RCFA): Methods and Techniques |
4-8/4/2009 |
Cairo |
2990 |
| T11 |
Advanced Steel Structure Design, Construction & Inspection |
11-15/4/2009 |
Cairo |
2990 |
| T12 |
Uninterruptible Power Supply UPS) Selection, Installation, Maintenance & Operation |
18-22/4/2009 |
Cairo |
2990 |
| T13 |
HVAC Performance Evaluation & Improvement of Reliability for Based Maintenance Systems |
18-22/4/2009 |
Cairo |
2990 |
| T14 |
Maintenance Management Best Practices: Systems, Tools & Techniques |
19-23/4/2009 |
Abu Dhabi |
2990 |
| T15 |
Electrical Equipment & Control Systems; Commissioning, Testing & Start up of Electrical Systems |
25-29/4/2009 |
Cairo |
2990 |
| T16 |
Piping & valves: Design, Construction Operation & Integrity |
25-29/4//2009 |
Riyadh |
3200 |
| T17 |
Control Safety Relief Valves; Operation, Selection & Troubleshooting |
26-30/4/2009 |
Dubai |
2990 |
| T18 |
Machinery Vibration Monitoring & Analysis |
26-30/4/2009 |
Dubai |
2990 |
| T10 |
Root Cause Failure Analysis (RCFA): Methods and Techniques |
4-8/4/2009 |
Cairo |
2990 |
| T11 |
Advanced Steel Structure Design, Construction & Inspection |
11-15/4/2009 |
Cairo |
2990 |
| T12 |
Uninterruptible Power Supply UPS) Selection, Installation, Maintenance & Operation |
18-22/4/2009 |
Cairo |
2990 |
| T13 |
HVAC Performance Evaluation & Improvement of Reliability for Based Maintenance Systems |
18-22/4/2009 |
Cairo |
2990 |
| T14 |
Maintenance Management Best Practices: Systems, Tools & Techniques |
19-23/4/2009 |
Abu Dhabi |
2990 |
| T15 |
Electrical Equipment & Control Systems; Commissioning, Testing & Start up of Electrical Systems |
25-29/4/2009 |
Cairo |
2990 |
| T16 |
Piping & valves: Design, Construction Operation & Integrity |
25-29/4//2009 |
Riyadh |
3200 |
| T17 |
Control Safety Relief Valves; Operation, Selection & Troubleshooting |
26-30/4/2009 |
Dubai |
2990 |
| T18 |
Machinery Vibration Monitoring & Analysis |
26-30/4/2009 |
Dubai |
2990 |